Renovating Your Home? Don’t Ignore the Electrical First-Fix

Written by Ian WalshOn the Safe Electric register
Safe Electric Registered Electrician • 24 Years

Key Takeaways for Dublin Homeowners
- Always execute electrical first-fix before plastering, tiling, or kitchen cabinetry installation.
- Plan socket heights, appliance loads, and media wall connections well in advance.
- Upgrading during building work costs 40% less than retrofitting into finished rooms.
Table of Contents
The Cost of Poor Electrical Sequencing
Few things are more frustrating for a homeowner than completing a €50,000 extension or bespoke kitchen renovation, only to realise the existing fuse board trips under the new induction hob, or that cables must be chased into fresh plaster to add under-cabinet lighting.
Engaging a Safe Electric contractor during architectural planning ensures first-fix runs are neatly concealed and dedicated high-amperage feeds are in place before plasterers arrive.
Related Certified Electrical Services

About Ian Walsh
With over 24 years of hands-on electrical experience since 2002, Ian Walsh is a licensed Safe Electric Registered Electrical Contractor , Safe Electric registered EV charger installer, and carries full public liability insurance. Every domestic installation comes with Ian's personal Return at No Extra Cost Guarantee.
Return at No Extra Cost Guarantee
If any aspect of our electrical workmanship isn't 100% right, we return promptly to resolve it free of charge.
Scope Your Project With Ian Walsh
Need certified help with House Rewiring? Specify your requirements and optionally snap a photo of your current fuse board for instant review.
Details about the house
Free survey. No obligation. Ian rings you back.